I am currently having an addition added to my current garage. I have a 12x12 shed with 12awg UFB wire running
thru 1-1/4 schedule 40 conduit to a 20 amp gfci circuit breaker in the garage panel. The conduit is approximately 18 inches deep.
There is a cutoff box in the shed. The shed runs a small compressor, Exhaust fan some lights and a few receptacles. I have never
had any problem with the current wiring.
The question is I need to temporarily remove this cable until construction is complete and then reinstall in the new
garage. This will result in a shorter distance of 20ft, previously 30ft. My question is;
1. Is this type of run to code? I know I can run UFB without conduit but I really would prefer to use conduit.
In the existing setup they simply ran the UFB to the garage and then conduit ends and the UFB goes straight to the
service box.
If I cannot use UFB and use THWN, Do I run 3 wires Black, White & Green and wire them the same as UFB in the garage Panel?
Once inside the garage, do I just continue schedule 40 to the garage panel.
2. Given the load I described is 12Awg sufficient?
Note; I have done basic wiring with NMB/Romex, have never used single wire THWN so give details if this is required.
Appreciate any help from anyone out there.
thru 1-1/4 schedule 40 conduit to a 20 amp gfci circuit breaker in the garage panel. The conduit is approximately 18 inches deep.
There is a cutoff box in the shed. The shed runs a small compressor, Exhaust fan some lights and a few receptacles. I have never
had any problem with the current wiring.
The question is I need to temporarily remove this cable until construction is complete and then reinstall in the new
garage. This will result in a shorter distance of 20ft, previously 30ft. My question is;
1. Is this type of run to code? I know I can run UFB without conduit but I really would prefer to use conduit.
In the existing setup they simply ran the UFB to the garage and then conduit ends and the UFB goes straight to the
service box.
If I cannot use UFB and use THWN, Do I run 3 wires Black, White & Green and wire them the same as UFB in the garage Panel?
Once inside the garage, do I just continue schedule 40 to the garage panel.
2. Given the load I described is 12Awg sufficient?
Note; I have done basic wiring with NMB/Romex, have never used single wire THWN so give details if this is required.
Appreciate any help from anyone out there.