I am finishing my basement and getting ready for the painting and flooring part. A couple of questions:
1. Should I paint the walls first and then add the baseboards? Is it better to paint the baseboards and then go back and touch them up/fill in the nail holes after?
2. Should I put up the baseboards before or after I carpet?
I am going to have the carpet installed professionally. I have some 5 1/4" baseboards that I want to put down. Should I do this before the carpet is laid or after? If before, how much gap do I need to leave between the bottom and the floor? Although I don't have any huge dips in the floor, I'm sure they aren't perfectly flat and level. Do I just pick a line that's level all the way around the room and let the gap range (say between 1/4" and 3/4" or should I try to follow a gap of a set width as close as I can?
Thanks,
Craig
1. Should I paint the walls first and then add the baseboards? Is it better to paint the baseboards and then go back and touch them up/fill in the nail holes after?
2. Should I put up the baseboards before or after I carpet?
I am going to have the carpet installed professionally. I have some 5 1/4" baseboards that I want to put down. Should I do this before the carpet is laid or after? If before, how much gap do I need to leave between the bottom and the floor? Although I don't have any huge dips in the floor, I'm sure they aren't perfectly flat and level. Do I just pick a line that's level all the way around the room and let the gap range (say between 1/4" and 3/4" or should I try to follow a gap of a set width as close as I can?
Thanks,
Craig
Comment