I have a 24x32 metal out building that currently has no flooring in it. i want to put a concrete slab floor in it. Currently the grade around the building is such that strom runoff runs into and back out of the building. I am going to regrade around the building and install underdrains. I am planning on putting a crushed stone base under the concrete with a plastic vapor barrier. Question is should I put the vapor barrier between the dirt and the stone or between the stone and concrete?
Announcement
Collapse
No announcement yet.
Slab Floor Sub Base
Collapse
Forum Top GA Ad Widget
Collapse
X
-
Slab Floor Sub Base
I have a 24x32 metal out building that currently has no flooring in it. i want to put a concrete slab floor in it. Currently the grade around the building is such that strom runoff runs into and back out of the building. I am going to regrade around the building and install underdrains. I am planning on putting a crushed stone base under the concrete with a plastic vapor barrier. Question is should I put the vapor barrier between the dirt and the stone or between the stone and concrete?
Tags: None