I am in the process of finishing a basement in a home that was built in 2006 and finished in 2007. I am doing the basement myself and have been noticing when doing the electrical work that the ceiling joist are not level on the bottom side or the basement ceiling. If you pull a chalk line 40-50 feet along the bottom of the joist they can vary as much as 0 to 1/2 inch. What does a person do to get these leveled up to hang drywall? I have already hung 30 cans for lighting in this basement. These are rough in only. I know I should have checked this earlier.
Any suggestions beside suspended ceiling which would mean removal and relocate all cans?
Any suggestions appreciated.
jrh
Any suggestions beside suspended ceiling which would mean removal and relocate all cans?
Any suggestions appreciated.
jrh
Comment