Hello all, been having a browse and this seems like a useful and friendly place indeed!
I hope this is the right topic for this question, it seems like its wall orientated rather than a 'catch all'. Anyhow, this is the current scenario:
We've been lazy and our bathroom is now in need of repair. The tiles had been badly laid and so plaster behind has come away from the wall behind and pushed out the tiles. Water has started leaking in so now we need to sort things out.
I'm planning to strip the tiles from the bath area (brute force) and then lay new tiles. I've had a look at how easy the tiles are to remove, and most just pop right off. In some places (where the tiles were being pushed out), the thin (2mm) layer of plaster (skim?) falls of too. In other, it stays where it is, with or without the tile adhesive.
My question is, what do I do with the old plaster thats sticking, and how do I level the wall for new tiles? I see there being 2 options:
1/- remove all down to the (what looks like cement based) plaster, but I don't really know), and then reskim and tile. Is the reskim necessary?
2/- try and fill in the holes with plaster filler and then retile.
Any suggestions? Am I on the right track?
Thanks for any help!
Matt
I hope this is the right topic for this question, it seems like its wall orientated rather than a 'catch all'. Anyhow, this is the current scenario:
We've been lazy and our bathroom is now in need of repair. The tiles had been badly laid and so plaster behind has come away from the wall behind and pushed out the tiles. Water has started leaking in so now we need to sort things out.
I'm planning to strip the tiles from the bath area (brute force) and then lay new tiles. I've had a look at how easy the tiles are to remove, and most just pop right off. In some places (where the tiles were being pushed out), the thin (2mm) layer of plaster (skim?) falls of too. In other, it stays where it is, with or without the tile adhesive.
My question is, what do I do with the old plaster thats sticking, and how do I level the wall for new tiles? I see there being 2 options:
1/- remove all down to the (what looks like cement based) plaster, but I don't really know), and then reskim and tile. Is the reskim necessary?
2/- try and fill in the holes with plaster filler and then retile.
Any suggestions? Am I on the right track?
Thanks for any help!
Matt