I recently discovered termites in my shed. I have purchased the termidor that I will be using, and have read on several sites about trenching around the building. A couple of sites mention rodding to 4ft. What is rodding? It isn't mentioned on the package insert.
Since the application rate is 4 gallons per 10 feet, both in the trench as well as in the holes drilled through slab concrete, why can't you just drill every 10-12 inches around the building and continue to use the same application rate?
Since the application rate is 4 gallons per 10 feet, both in the trench as well as in the holes drilled through slab concrete, why can't you just drill every 10-12 inches around the building and continue to use the same application rate?