I'm gaining on Troy. Will start that bathroom remodeling pretty soon! Today we raised the second floor up about an inch and it's setting on four 4 x 4 stilts to the basement floor. The first floor is now on a 12' 4 x 4 I-beam and that's setting on three temporary jackposts. Will have the permanents in place by Monday. There was a two-brick thick 8' x 10' wall setting on a perimeter 10" x 10" beam that was taken down also. The 10/10 was heavily eaten away by past carpenter ants, as was the upper plate. That I-beam is taking the place of that rotted perimeter beam. THe next step will be to sister up the water rotted first floor joists. Replace the subfloor after that, then build up a new stud wall for the second floor joists to rest on. Won't be too much longer after that when I can start that neat remodeling job!