Hey everyone,
I'm finishing a basement that utilises adjustable jack posts to support a beam from the upstairs floor. I am going to build a wall RIGHT THROUGH both posts. Should I be enclosing the things? Aren't they supposed to remain accessible for adjustment purposes? The beam they support is 4 2 x 12's glued and bolted together. I was going to build the wall to enclose this all the way to the floor (6" thick). By code am I allowed to enclose these ugly but practical posts?
Craig
http://www.homerepairforum.com/images/uploads/2005-4-1_DSCF0006_(2)_w550.JPG
I'm finishing a basement that utilises adjustable jack posts to support a beam from the upstairs floor. I am going to build a wall RIGHT THROUGH both posts. Should I be enclosing the things? Aren't they supposed to remain accessible for adjustment purposes? The beam they support is 4 2 x 12's glued and bolted together. I was going to build the wall to enclose this all the way to the floor (6" thick). By code am I allowed to enclose these ugly but practical posts?
Craig
http://www.homerepairforum.com/images/uploads/2005-4-1_DSCF0006_(2)_w550.JPG
Comment