Hi,
I am going to be installing a sub panel in my attached garage. I'll be running two 220 circuits, one for a wall A/C unit and one for a dryer. I have a 50amp breaker in the main service box and will be using two 20amp doubles in the sub panel. The wire, 8 gauge, will be in metal conduit on the outside of the building, approx.70', then through the wall at the garage. My question. Does it make a difference solid or stranded? Stranded might be easier to pull. Any code on what size conduit for 4 wires?
Thanks in advance, this is my first post. I've read with interest some of the threads posted here. I liked the simple yet very informative responses offered.
I am going to be installing a sub panel in my attached garage. I'll be running two 220 circuits, one for a wall A/C unit and one for a dryer. I have a 50amp breaker in the main service box and will be using two 20amp doubles in the sub panel. The wire, 8 gauge, will be in metal conduit on the outside of the building, approx.70', then through the wall at the garage. My question. Does it make a difference solid or stranded? Stranded might be easier to pull. Any code on what size conduit for 4 wires?
Thanks in advance, this is my first post. I've read with interest some of the threads posted here. I liked the simple yet very informative responses offered.
Comment