Hey guys,
I will just get right to the point here. I have pulled up the old tiles in my bathroom and they used what appears to be a light brown glue substance to hold them down. I am guessing this is very very old as the old tile came up no problem and this glue is flaking in spots. Before i lay down my peel n stick, what will need to be down to ensure that they stay down for many years to come?. Also, when i pulled up the tiling i noticed around my toilet that there is alot of rot around it. What would be the best bet to replacing this. My bathroom is about 10x20 and i do not want to really pull up the hole sub floor. Basically just cut out the rot and replace that, i have old cast iron piping, will there be any problems when removing the old flooring or is the piping securede into a joist? also, will i need to buy a new hold down kit for the cast iron piping or should i reuse the old one?
I will just get right to the point here. I have pulled up the old tiles in my bathroom and they used what appears to be a light brown glue substance to hold them down. I am guessing this is very very old as the old tile came up no problem and this glue is flaking in spots. Before i lay down my peel n stick, what will need to be down to ensure that they stay down for many years to come?. Also, when i pulled up the tiling i noticed around my toilet that there is alot of rot around it. What would be the best bet to replacing this. My bathroom is about 10x20 and i do not want to really pull up the hole sub floor. Basically just cut out the rot and replace that, i have old cast iron piping, will there be any problems when removing the old flooring or is the piping securede into a joist? also, will i need to buy a new hold down kit for the cast iron piping or should i reuse the old one?
Comment