Ok, I just purchased a new construction home that's 99% complete. I close on the deal next week. Problem is the General COntractor wasn't paying attention when the electrition put in the panel. He put directly in front of the roughed in drain for the shower/bath.
He is saying that he doesn't want to do anything about it and he can't blame the plumber because the plumbing was done before the wiring but its too expensive to have the panel moved now. He wants me to buy the house as is.
How big a deal is it to either move the panel or chip out the floor and move the drain? Is this something I should just say fine give me $1000 off the house and I'll do it on my own when I finish that bath or should I hold my guns and not close until he fixes it?
He is saying that he doesn't want to do anything about it and he can't blame the plumber because the plumbing was done before the wiring but its too expensive to have the panel moved now. He wants me to buy the house as is.
How big a deal is it to either move the panel or chip out the floor and move the drain? Is this something I should just say fine give me $1000 off the house and I'll do it on my own when I finish that bath or should I hold my guns and not close until he fixes it?