I will be getting some bids to route some natural gas lines through a fossit I made. Just from the looks of it, it will require some flexible tubing (about 10 feet) and then the rest regular gas lines (about 20 feet with 1 or 2 turns in between). What would the typical cost of this be? Do I need a permit? What about doing it myself. How difficult is it. (I have done smaller gas pipes in the past when I replaced a water heater, but I get intimidated at the size of the pipes (they are about 2 inches thick!) Plus I dont want to put my family in danger)
Thanks for all the help!
Thanks for all the help!
Comment