Thank You so much for the help you have already provided from reading over the previous post. My summer project is remodeling the kitchen. The sink and dishwasher are being moved over about 8'. I am starting to plump in the sink and so far have connected the double sing to a p trap with 1 1/2 pvc. which then connects back thru the wall cavity, tee's off down to the crawl space where I connected it to 2" pvc just after the 1 1/2 90. The other tee 90's over thru the next cavity along the window and up to the attic where it will connect to the old vent. It pretty much mimmicks the current set up. I am confused about 2 things. Currently the 2" under the crawl is galvanized travels to the other side of the crawl (12') 90's another 10' and 90's down to the waste pipe. There is not a pitch to the pipe should the new one have a 1/4" pitch. If I do pitch it how would the last connection be made since it is a 90 the thread's would not line up. The second question is for the dishwasher drain should there be an "air gap". The current configuration does not have one but it does go up over the inside of the cabinet just under the countertop and connects to the wye instead of straight thru the cabinet. I hope you can make sense of my long winded question.
Thank You so much
Pat
Thank You so much
Pat
Comment