Hello,
I built a swingset with a Fort and I am (begging) asking for some help.
I built a 6 foott by 4 foot Fort using 4-4x4, 12 foot long PT wood. I cemented about 1.5 feet and the rest is obove ground.
The wooden floor is about 4 feet from the ground. I used 4 - 4x4 PT wood for the Floor.
On the left side I have attached an A-Frame for 2 swings using a 10 foot 4x6 beam. The A-Frame is also cemented.
Problem:
When my kids use the swings the entire Fort shakes. It shakes more when they use the swing closest to the Fort.
At the top of the Fort I have screwed and connected all 4 4x4 post with 2x4 wood.
What else can I do to prevent the Fort from shaking?
Please help.
Thank you.
TonyB.
I built a swingset with a Fort and I am (begging) asking for some help.
I built a 6 foott by 4 foot Fort using 4-4x4, 12 foot long PT wood. I cemented about 1.5 feet and the rest is obove ground.
The wooden floor is about 4 feet from the ground. I used 4 - 4x4 PT wood for the Floor.
On the left side I have attached an A-Frame for 2 swings using a 10 foot 4x6 beam. The A-Frame is also cemented.
Problem:
When my kids use the swings the entire Fort shakes. It shakes more when they use the swing closest to the Fort.
At the top of the Fort I have screwed and connected all 4 4x4 post with 2x4 wood.
What else can I do to prevent the Fort from shaking?
Please help.
Thank you.
TonyB.
Comment