Announcement

Collapse
No announcement yet.

crawl space to finished basement

Collapse

Forum Top GA Ad Widget

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • crawl space to finished basement

    I have 10 foot headroom from the soil to the first floor joists. Foundation and walls are block. how can this be framed out?

  • #2
    Do you have soil flooring? I guess the first step is to pour a floor. Is that what you mean?

    I assume their is ductwork, etc along the "ceiling?" Consider a drop ceiling.

    Metal studs might be useful for such an application.

    Comment

    Working...
    X