i am having a 30'x30' cement slab poured soon and it will be for a shop/apartment. I will have a tub and toilet and was wondering if and how i should do the plumbing. Do i have to run the plumbing in the foundation/slab or is there a way to run it out the side of the shop and then to the septic.. Im new to this so be gentle.. thanks.
measure twice cut once
measure twice cut once
Comment